TGG (Azure Midstream)

The Shelby/Nacogdoches County Pipeline System consists of 282,000 linear feet of pipelines which were completed from the preliminary phase to the final as-built survey, performed during construction. This Includes the NGPL 21-mile 24” pipeline. All pipelines included preliminary layout, staking, plats and alignment sheets, and as-built during construction