Contact Us
Team
Home
All surveys, plat requirements, and filing procedures are done in compliance with the state of Texas Railroad Commission.


DDM collaborates with environmentalists, land owners, and exploration companies to determine the abosolute closest constructable location to the proposed target.


DRILL SITES
Well Pads
Pipelines
Unit Surveys
Boundary
Engineering
Services
ddm_surveying_1003011.jpg

We pride ourselves in availability and turn around time.
ddm_surveying_1003009.gif
A Surveying and Mapping company that specializes in Oil and Gas.
Contact Us
Team
  1. Drill site planning
  2. Preliminary staking / soft staking
  3. Hard staking final location
  4. Re-staking pit and clear limits
  5. Final well stake for conductor

generated with ISM

DDM SURVEYING, INC.
121 N. VAN BUREN
HENDERSON, TX 75652
OFFICE 903.657.6229
FAX 903.657.8117
Firm License No. 10045900
ddm_surveying_1003006.jpg ddm_surveying_1002046.jpg
Home




No job is too large or too small, from a single rig operator to the major players, we service all extents of the exploration community.





DDM has raised the bar with speed and accuracy, surveying and preparing Unit Plats in short time frames.
Pads and Units
Pipelines
Boundary
Engineering
Services
DDM Surveying, Inc.
All Rights Reserved.
Pads and Units
All staked Pads are thoroughly inspected for existing utilites using the
GEM SYSTEMS GSM 19-TW PROTON PRECESSION MAGNETOMETER.
CLICK HERE FOR AN ESTIMATE
ddm_surveying_1003004.jpg ddm_surveying_1003002.jpg ddm_surveying_1001001.jpg ddm_surveying_1003001.jpg